IFS Logistics: pest control in warehouses and logistics

Illustration

At a glance

IFS Logistics covers transport, storage and distribution of food and non-food products.

Who is subject to it or asks for it?

Logistics, bonded warehouse and distribution firms storing food and packaging.

What it expects from pest control

Risk-based monitoring and records at entry and exit points, docks and loading areas.

What does the auditor ask for?

  • Dock door control
  • Indoor rodent and insect monitoring
  • Records and trend
  • Link with customer complaints and returns

How Pak İş IPM and PMDP meet it

Pak İş builds the programme on IPM: survey and risk analysis, station and monitor placement plan, periodic service and trend review. Service records, the station map and related documents are kept in the PMDP customer portal and can be shown at audit. This is not a guarantee of an audit result; the result depends on the site’s own system, hygiene practice and the certification body’s assessment.

Records: what will you show?

  • Service report: date, time, applicator, area and action taken
  • Station/monitor map and numbered station list
  • Activity counts and trend chart
  • Product label, safety data sheet and permit information
  • Corrective action: finding, root cause, action, owner and closure date

The backbone of the programme: the IPM cycle

  • Survey and risk analysis
  • Exclusion
  • Source removal
  • Monitoring and counting
  • Trend and threshold
  • Targeted intervention
  • Verification and root cause

Common mistakes

  • Treating a one-off treatment as a programme: without monitoring and trend there is no system evidence.
  • Keeping records scattered: on audit day documents cannot be found and closure evidence is missing.
  • Expecting treatment to fix entry and hygiene problems such as open doors, waste and damp.
  • Not checking whether the standard version and customer requirement are current.

Important note

This page is general information, not legal or certification advice. Standards and regulations are updated; consult the official text and your certification body for current requirements.

Frequently asked questions

What is the most critical point in a warehouse?

Docks and loading areas: door gaps, incoming goods and waste together form the main entry route.

What is checked at container intake?

Interior surfaces, floor and product for live insects, rodent signs and moisture; findings follow a record and notification procedure.

How does Pak İş help?

Survey and risk analysis, an IPM-based programme, station maps, service reports and records kept traceable in the PMDP portal; no audit result is guaranteed.

Request a quote and survey